PennDOT announces tentative work schedule
Notice: Undefined variable: article_ad_placement3 in /usr/web/cs-washington.ogdennews.com/wp-content/themes/News_Core_2023_WashCluster/single.php on line 128
Greene County Maintenance Manager Jerome Simkovic announced a tentative work plan for the week of Aug. 25.
All maintenance activities are conducted on a weather-permitting basis. Motorists should drive with caution throughout all work areas and be alert for signed work zones requiring the usage of headlights.
The schedule is as follows:
• Culvert pipe reconstruction is being conducted on Route 1021, Crucible Road (Cumberland Township).
• Major slide repair and ditch cleaning activities are scheduled for Route 3007, Blockhouse Run Road and on Route 3010, Deep Valley.
• Bridge cleaning is being conducted on Route 18 from Waynesburg to the West Virginia line; also on various routes in Jackson, Gilmore and Springhill townships.
• Shoulder cutting and grading activities are scheduled for Route 4023 through Route 4035, (Richhill, Center and Morris townships) secondary roads.
• Pot hole patching will continue on Route 21 from Junction Deli to Waynesburg, and Route 19, High and Greene streets in Waynesburg.
• State roads will be reviewed and signs will be updated, downed signs will be replaced and concerns addressed on various state roads throughout the county.
• The State Correctional Institution of Greene (CPW) will conduct roadside litter pick up operations on I-79 from the Washington County line to the West Virginia state line. Please drive carefully when encountering this moving operation.
PennDOT has a 24-hour toll free number for residents to call to report any road maintenance concerns. This number can also be utilized to report locations of dead deer on state highways. The number is 1-800-FIX-ROAD (1-800-349-7623).