Bridge in California to close for replacement
Notice: Undefined variable: article_ad_placement3 in /usr/web/cs-washington.ogdennews.com/wp-content/themes/News_Core_2023_WashCluster/single.php on line 128
Work to replace the bridge that carries South Ridge Road over Pike Run in California will begin Feb. 17, the state Department of Transportation said. This $1.1 million project includes the bridge replacement, minor approach work, drainage, signage and pavement markings.
On Feb. 17, the bridge will be closed and a marked detour will be in place that uses Pike Run Drive and South California Drive. The project is expected to complete in late October 2014.
This is a design-build project where the winning bid included the design by Gibson-Thomas Engineering, Inc. and the construction by Frank Gavlik & Sons.