Parkway West work scheduled
Notice: Undefined variable: article_ad_placement3 in /usr/web/cs-washington.ogdennews.com/wp-content/themes/News_Core_2023_WashCluster/single.php on line 128
Crack- and joint-sealing work will resume Monday night on the Parkway West (Interstate 376).
Crews will be doing the work between the Beaver County line and Interstate 79 interchange. The slow-moving operation will require single-lane closures between 10 p.m. and 6 a.m. weeknights through Aug. 6. Work will include interchange ramps. All ramps will remain open during the work.