Route 60 work
Notice: Undefined variable: article_ad_placement3 in /usr/web/cs-washington.ogdennews.com/wp-content/themes/News_Core_2023_WashCluster/single.php on line 128
Traffic on Route 60 (Steubenville Pike) will be reduced to a single lane this weekend so the road can be repaved between Old Steubenville Pike and Hightower Boulevard. Work will be done between 1 p.m. Friday and 1 p.m. Saturday and from 8 p.m. Saturday to 1 p.m. Sunday.