Notice: Undefined offset: 0 in /usr/web/cs-washington.ogdennews.com/wp-content/themes/News_Core_2023_WashCluster/includes/dfp_code.php on line 98

Notice: Trying to get property 'slug' of non-object in /usr/web/cs-washington.ogdennews.com/wp-content/themes/News_Core_2023_WashCluster/includes/dfp_code.php on line 98
close

Notice: Undefined variable: paywall_console_msg in /usr/web/cs-washington.ogdennews.com/wp-content/themes/News_Core_2023_WashCluster/includes/single/single_post_meta_query.php on line 71

Notice: Undefined offset: 0 in /usr/web/cs-washington.ogdennews.com/wp-content/themes/News_Core_2023_WashCluster/single.php on line 18

Notice: Trying to get property 'cat_ID' of non-object in /usr/web/cs-washington.ogdennews.com/wp-content/themes/News_Core_2023_WashCluster/single.php on line 18

#5– Water tanker collapses a portion of Pollocks Mill Bridge

1 min read
article image -

Notice: Undefined offset: 0 in /usr/web/cs-washington.ogdennews.com/wp-content/themes/News_Core_2023_WashCluster/includes/single/strategically_placed_photos_article.php on line 412

Notice: Trying to get property 'term_id' of non-object in /usr/web/cs-washington.ogdennews.com/wp-content/themes/News_Core_2023_WashCluster/includes/single/strategically_placed_photos_article.php on line 412

An overweight tanker truck carrying water to a natural gas drilling site collapsed a portion of the four-ton, weight-restricted Pollocks Mill Bridge on Sept. 28.

The driver of the truck, Jason W. Strawderman, 38, of Beverly, W.Va., pleaded guilty Oct. 9 to disobeying a traffic control device and operating a vehicle that exceeded the weight restriction. He was fined $10,297.

Strawderman was hauling water from the Monongahela River to an EQT well site on Pollocks Mill Road when he attempted to cross the bridge. Strawderman told police his global positioning system led him to the bridge and he did not see the weight restriction signs.

It took two days to remove the truck from the bridge and required the use of two heavy-duty tow trucks operating in tandem. The process also required a temporary gas shut-off to about 4,500 customers of the People’s Natural Gas Co., whose gas line crossed the bridge.

CUSTOMER LOGIN

If you have an account and are registered for online access, sign in with your email address and password below.

NEW CUSTOMERS/UNREGISTERED ACCOUNTS

Never been a subscriber and want to subscribe, click the Subscribe button below.

Starting at $3.75/week.

Subscribe Today